Our Campus

New Campus Opening in Fall of 2028

The new Crescent Heights Academy facility is planned to open in fall 2028. Our plan is to build a facility that emphasizes values such as collaboration, innovation and sustainability that support our core design drivers of relationship, community, natural light and wellness. We aim to provide a forward-thinking and supportive atmosphere for students and faculty to thrive in an ever-evolving landscape of education.

The CHA Board of Directors engaged Future Design School, to survey faculty, students, families and leadership. The survey contained questions about both the facility and the educational program so that the planning around the facility could include functional programming of space uses/adjacencies/flow which is critical to confirming space needs. Since that time, the board has secured our architect, KMBR to plan and design our new 110,000 square foot building. In addition, our development consultant is working with sub consultants including surveyors, civil engineers, geotechnical engineers, environmental engineers, transportation engineers, arborists, and landscape architects as well as the City of Surrey. 

Over the next year, we will continue the planning phase and will collaborate with architects and the City of Surrey to obtain development and building permits as well as construction contracts. We will then move to the two-year building phase. 

Building Stage

The project is currently in the bulk excavation and site preparation phase

New Campus Development

Explore the architectural renderings of the newly proposed spaces to gain insight into the vision for our future learning environments.

Please note: These images are renderings, and the final design may differ from what is shown. The colour scheme has not yet been finalized.

Atrium Level 1

From the south looking north, the lower foyer features two gym entrances on the left and a patio to the soccer turf field on the right.

Atrium Level 2

From the third-level entrance, the foyer is seen from a north-facing viewpoint, looking southward, with the library positioned to the left.

Junior Library

The junior section of the library includes versatile seating options and wide windows overlooking the southwest view.

Double Gymnasium

This double gym includes retractable bleachers and an upper viewing area, with a single gym situated to the north.

Evan March; Surrey Development Planner:

604 591 4734

emarch@surrey.ca

Norman Laube; Owner’s Representative:

778 953 1653

norman@laubenfels.com

Current Campus Locations

CHA is currently located in three locations with a plan to be housed under one roof in the 2028/29 school year at 18620 – 56 Ave. Surrey, BC

If you’re seeking more information about the location of our current facilities, details are available below.

Primary Campus

Kindergarten to Grade 2 (KG-3 in the Fall)

19533 64th Avenue, Surrey

Intermediate Campus

Grade 3 to 5 (Grade 4-6 in the Fall)

17465 60th Avenue, Surrey

Senior Campus

Grade 6 to 12 (Grade 7-12 in the Fall)

18620 56th Avenue, Surrey